Start with the existing space
A bare-shell unit, a previously occupied office and a partially fitted floor require different work. Record what can remain, what must be removed and where new services need to connect before comparing prices.
Separate design choices from project constraints
Finishes and furniture affect the design allowance. Building regulations, work permits, delivery hours, freight-lift access and protection requirements affect how the work can be delivered. Both belong in the brief.
Ask for a scope-led estimate
A single rate per square metre can hide exclusions. Request a breakdown of design, construction, technical systems, furniture, professional fees, approvals and contingency, then test it against the target opening date.